Leave Your Message

MD500 Multi-Arc Ion Plating Coating Equipment for Cutting Tools - China Suppliers and Factory

MD500 is a cutting-edge multi-arc ion plating coating system, specifically designed for small to medium-batch production of cutting tools in China. This system is particularly ideal for carbide end mills, drills, inserts, and the reconditioning of tools. Integrating advanced multi-arc ion plating technology with WET lateral hot filament etching, the MD500 ensures superior coating adhesion and exceptional process stability. As a trusted factory and supplier, we offer flexible production capabilities to meet a wide range of tool coating applications, making us a leading choice for manufacturers looking to enhance their cutting tool performance.

    Product Advantage

    High deposition rate

    The current density of the arc spot is as high as 1012A/m2, and the energy density is as high as 1013W/m2. The high energy density directly leads to the transformation of the target material at the arc spot from solid phase to metal vapor plasma.

    High ionization rate

    Arc discharge is generated between the cathode evaporation source and the shell, and glow discharge is generated between the workpiece base and the shell, causing the cathode target to evaporate and ionize, generally up to 60-80%.

    efficient and convenient

    Fully automatic coating system, efficient and reliable, capable of batch production 4-5 times a day, equipped with historical records, storable process recipes, offline editing, abnormal alarm, and touch screen operation.

    High impact resistance

    The film has moderate hardness, film adhesion, high rigidity, and good impact resistance, suitable for rough machining.

    Product characteristics

    • Product characteristics
      Capability for fast delivery (Get the shortes production process)
    • Product characteristics
      Customized individually
    • Product characteristics
      High stability (More than 10 years ofproduction experience)
    MD Equipment-Arc PVD Coating

    Workpiece:

    42CrMo (38-42HRC)

    GB:42CrMo

    ASME:4140

    JIS:SCM440

    Cutting data:Blind Hole Drilling

    Cutting speed Vc = 70m/min

    Feeding Fn = 0.15mm/r

    Cooling:External cooling, Emulsion

    MD Equipment-Arc PVD Coating (3)

    Result:

    Huasheng's HPD130 coated tool can achieve a cutting life of 63 meters

    The coated tool from competitor BHE offers a cuttinglife of 49 meters。

    The cutting life has been improved by 28.6%

    MD Equipment-Arc PVD Coating (1)
    MD Equipment-Arc PVD Coating (10)

    Product Parameter

    Model MD500
    Coating Technology Arc ion plating
    Max Working Temp. 600 °C
    Max Load Capacity 300 KG

    Technical Specifications

    Parameter Specification Details
    Model No. MD500
    Coating Technology Arc ion plating
    Etching WET lateral hot filament etching
    Dimension (mm) L3400 × W2150 × H2500
    Chamber Volume (m³) 0.7
    Effective Coating Area (mm) Φ410 × 400
    Max Working Temp. (°C) 600
    Capacity (trees) 5
    Insert Load (APMT1135) 6000 pcs
    Round Tool Load (D4×50L) 1800 pcs
    Max Load (KG) 300
    Spindle Diameter (mm) Φ130
    Process Time (h) AlTiN 6–8

    Frequently Asked Questions

    What coating technology and etching method does the MD500 utilize?

    The MD500 utilizes advanced Arc ion plating coating technology coupled with WET lateral hot filament etching for optimal surface preparation and coating adhesion.

    What is the production capacity per batch for cutting tools?

    The machine features a 5-tree capacity capable of holding up to 6,000 pieces of APMT1135 inserts or 1,800 pieces of D4×50L round tools, with a total maximum load capacity of 300 kg.

    What is the effective coating zone and chamber volume?

    The system is built with a 0.7 m³ chamber volume, offering an effective coating area of Φ410 × 400 mm and a spindle diameter of Φ130 mm.

    What is the maximum operating temperature of the system?

    The MD500 system supports a maximum working temperature of up to 600 °C.

    How long does a standard AlTiN coating cycle take?

    The typical process time for an AlTiN deposition cycle ranges from 6 to 8 hours depending on coating thickness and specific application parameters.

    What are the external physical dimensions of the MD500 machine?

    The overall equipment footprint measures L3400 mm × W2150 mm × H2500 mm.

    sendinquiry