• icon_youtube
  • Linkedin
  • Leave Your Message

    MD200 Arc Coating Equipment: Top China Suppliers & Factory for Compact Ion Plating Systems for Tools

    Introducing the MD200, a state-of-the-art compact arc ion plating system tailored for small-batch production, non-standard tools, and the coating of resharpened tools. Manufactured in China, this advanced machine features four arc sources and WET lateral hot filament etching, ensuring superior coating quality and flexible production capabilities. Ideal for suppliers seeking to enhance their in-house coating processes, the MD200 empowers factories to achieve consistent and practical results in tool coatings, making it an essential addition to any manufacturing setup

      Product Advantage

      High deposition rate

      The current density of the arc spot is as high as 1012A/m2, and the energy density is as high as 1013W/m2. The high energy density directly leads to the transformation of the target material at the arc spot from solid phase to metal vapor plasma.

      High ionization rate

      Arc discharge is generated between the cathode evaporation source and the shell, and glow discharge is generated between the workpiece base and the shell, causing the cathode target to evaporate and ionize, generally up to 60-80%.

      efficient and convenient

      Fully automatic coating system, efficient and reliable, capable of batch production 4-5 times a day, equipped with historical records, storable process recipes, offline editing, abnormal alarm, and touch screen operation.

      High impact resistance

      The film has moderate hardness, film adhesion, high rigidity, and good impact resistance, suitable for rough machining.

      Product characteristics

      • Product characteristics
        Capability for fast delivery (Get the shortes production process)
      • Product characteristics
        Customized individually
      • Product characteristics
        High stability (More than 10 years ofproduction experience)
      MD Equipment-Arc PVD Coating

      Workpiece:

      42CrMo (38-42HRC)

      GB:42CrMo

      ASME:4140

      JIS:SCM440

      Cutting data:Blind Hole Drilling

      Cutting speed Vc = 70m/min

      Feeding Fn = 0.15mm/r

      Cooling:External cooling, Emulsion

      MD Equipment-Arc PVD Coating (3)

      Result:

      Huasheng's HPD130 coated tool can achieve a cutting life of 63 meters

      The coated tool from competitor BHE offers a cuttinglife of 49 meters。

      The cutting life has been improved by 28.6%

      MD Equipment-Arc PVD Coating (1)
      MD Equipment-Arc PVD Coating (10)

      Product Parameter

      Model No. MD200
      Coating Technology Arc ion plating
      Etching WET lateral hot filament etching
      Dimension (mm) L3400 × W2000 × H2500
      Chamber volume (m³) 0.5
      Effective Coating Area (mm) Φ310 × 400
      Max Working Temp. (°C) 500
      Capacity (trees) 3
      Insert Load (APMT1135) 3600 pcs
      Round tool Load (D4×50L) 1000 pcs
      Max Load (KG) 200
      Spindle diameter (mm) Φ130
      Process Time (h) AlTiN 6–8
      Frequently Asked Questions
      What coating technology does the MD200 system use?
      The MD200 utilizes advanced Arc Ion Plating technology combined with WET lateral hot filament etching to ensure superior coating adhesion, density, and uniformity.
      What is the typical load capacity of the MD200 coating machine?
      The machine has a maximum load capacity of 200 KG. It can accommodate up to 3600 pieces of APMT1135 inserts or 1000 pieces of D4×50L round tools per cycle, operating with a 3-tree capacity system.
      What are the dimensions and chamber volume of the MD200?
      The external dimensions of the MD200 are L3400 × W2000 × H2500 mm. It features a chamber volume of 0.5 m³ and provides an effective coating area of Φ310 × 400 mm.
      What is the maximum working temperature of the system?
      The MD200 is designed to operate at a maximum working temperature of up to 500 °C, making it suitable for high-performance thermal coating applications.
      How long does the AlTiN coating process take on the MD200?
      The process time for applying an AlTiN (Aluminum Titanium Nitride) coating typically ranges from 6 to 8 hours, depending on the specific thickness and batch parameters.

      sendinquiry