Leave Your Message

MD Series-Arc PVD Coating Machine from China Suppliers - High Performance Coating Solutions by Leading Factory

MD Equipment utilizes Huasheng's innovative lateral etching technology combined with multi-arc ion plating to deliver high ionization rate arc plasma coating solutions. These coatings exhibit remarkable versatility and significantly enhance the lifespan of tools in applications such as steel milling and stainless steel turning. The equipment's high reliability and stable processes streamline the coating production, making it simpler and more efficient. As a leading factory in China, we are committed to providing top-quality products and serving our customers with the best solutions in the industry. Trust our suppliers for cutting-edge coatings that boost performance and durability

    Product Advantage

    High deposition rate

    The current density of the arc spot is as high as 1012A/m2, and the energy density is as high as 1013W/m2. The high energy density directly leads to the transformation of the target material at the arc spot from solid phase to metal vapor plasma.

    High ionization rate

    Arc discharge is generated between the cathode evaporation source and the shell, and glow discharge is generated between the workpiece base and the shell, causing the cathode target to evaporate and ionize, generally up to 60-80%.

    efficient and convenient

    Fully automatic coating system, efficient and reliable, capable of batch production 4-5 times a day, equipped with historical records, storable process recipes, offline editing, abnormal alarm, and touch screen operation.

    High impact resistance

    The film has moderate hardness, film adhesion, high rigidity, and good impact resistance, suitable for rough machining.

    Product characteristics

    • Product characteristics
      Capability for fast delivery (Get the shortes production process)
    • Product characteristics
      Customized individually
    • Product characteristics
      High stability (More than 10 years ofproduction experience)
    MD Equipment-Arc PVD Coating

    Workpiece:

    42CrMo (38-42HRC)

    GB:42CrMo

    ASME:4140

    JIS:SCM440

    Cutting data:Blind Hole Drilling

    Cutting speed Vc = 70m/min

    Feeding Fn = 0.15mm/r

    Cooling:External cooling, Emulsion

    MD Equipment-Arc PVD Coating (3)

    Result:

    Huasheng's HPD130 coated tool can achieve a cutting life of 63 meters

    The coated tool from competitor BHE offers a cuttinglife of 49 meters。

    The cutting life has been improved by 28.6%

    MD Equipment-Arc PVD Coating (1)
    MD Equipment-Arc PVD Coating (10)

    Product Parameter

    Model
    MD200
    Technology
    Arc Ion Plating
    Max Temp
    500 ℃
    Max Load
    200 KG
    Model MD200
    Coating technology Arc Ion Plating
    Etching WET Lateral Hot Filament Etching
    Arc sources 4
    Equipment size(mm) Length*Width*Height: 3400*2000*2500
    Volume(m³) 0.5
    Effective coating area(mm) Ф310*400
    Maximum working temperature(℃) 500
    Power(kW) 120
    Capacity (number of trees) 3
    Insert load(APMT1135) 3600pcs
    End mill load (D4*50L) 1000pcs
    Maximum loading weight(KG) 200
    Spindle diameter(mm) Ф130
    Process time(h) AlTiN:6~8
    Frequently Asked Questions

    Q: What coating technology is utilized in the MD200 system?

    The MD200 system utilizes Arc Ion Plating coating technology combined with WET Lateral Hot Filament Etching.

    Q: What is the maximum working temperature and load weight capacity?

    The equipment supports a maximum working temperature of 500℃ and a maximum loading weight of 200 KG.

    Q: How many inserts and end mills can the MD200 load per batch?

    It has a batch capacity of 3600 pieces for APMT1135 inserts or 1000 pieces for D4*50L end mills.

    Q: What are the overall dimensions and volume of the MD200?

    The overall dimensions are 3400mm * 2000mm * 2500mm (Length*Width*Height) with an effective chamber volume of 0.5 m³.

    Q: What is the typical process time required for AlTiN coating?

    The standard process time for AlTiN coating on the MD200 is between 6 to 8 hours.

    sendinquiry