• icon_youtube
  • Linkedin
  • Leave Your Message

    High-Performance MD Series-Arc PVD Coating Machine - China Suppliers & Factory for Enhanced Durability

    MD equipment incorporates Huasheng's innovative lateral etching technology and advanced multi-arc ion plating to deliver a high ionization rate arc plasma coating solution. The coatings produced by our technology demonstrate remarkable versatility and significantly enhance the service life in applications such as steel milling and stainless steel turning. With improved equipment reliability and process stability, our factory ensures that coating production is more straightforward and efficient. As a leading supplier in China, we are committed to providing high-performance solutions for your coating needs

      Product Advantage

      High deposition rate

      The current density of the arc spot is as high as 1012A/m2, and the energy density is as high as 1013W/m2. The high energy density directly leads to the transformation of the target material at the arc spot from solid phase to metal vapor plasma.

      High ionization rate

      Arc discharge is generated between the cathode evaporation source and the shell, and glow discharge is generated between the workpiece base and the shell, causing the cathode target to evaporate and ionize, generally up to 60-80%.

      efficient and convenient

      Fully automatic coating system, efficient and reliable, capable of batch production 4-5 times a day, equipped with historical records, storable process recipes, offline editing, abnormal alarm, and touch screen operation.

      High impact resistance

      The film has moderate hardness, film adhesion, high rigidity, and good impact resistance, suitable for rough machining.

      Product characteristics

      • Product characteristics
        Capability for fast delivery (Get the shortes production process)
      • Product characteristics
        Customized individually
      • Product characteristics
        High stability (More than 10 years ofproduction experience)
      MD Equipment-Arc PVD Coating

      Workpiece:

      42CrMo (38-42HRC)

      GB:42CrMo

      ASME:4140

      JIS:SCM440

      Cutting data:Blind Hole Drilling

      Cutting speed Vc = 70m/min

      Feeding Fn = 0.15mm/r

      Cooling:External cooling, Emulsion

      MD Equipment-Arc PVD Coating (3)

      Result:

      Huasheng's HPD130 coated tool can achieve a cutting life of 63 meters

      The coated tool from competitor BHE offers a cuttinglife of 49 meters。

      The cutting life has been improved by 28.6%

      MD Equipment-Arc PVD Coating (1)
      MD Equipment-Arc PVD Coating (10)

      Product Parameter

      MD200 Equipment Specifications
      Model MD200
      Coating technology Arc Ion Plating
      Etching WET Lateral Hot Filament Etching
      Arc sources 4
      Equipment size(mm) Length*Width*Height: 3400*2000*2500
      Volume(m³) 0.5
      Effective coating area(mm) Ф310*400
      Maximum working temperature(℃) 500
      Power(kW) 120
      Capacity (number of trees) 3
      Insert load(APMT1135) 3600pcs
      End mill load (D4*50L) 1000pcs
      Maximum loading weight(KG) 200
      Spindle diameter(mm) Ф130
      Process time(h) AlTiN:6~8
      MD Equipment-Arc PVD Coating
      Frequently Asked Questions
      1. What coating technology does the MD200 equipment use?
      The MD200 utilizes Arc Ion Plating technology combined with WET Lateral Hot Filament Etching to ensure high-quality and precise coating performance.
      2. What is the batch capacity and loading limit of the MD200?
      The machine has a maximum loading weight of 200 KG and can hold up to 3 trees. Specifically, it can load 3600 pieces of APMT1135 inserts or 1000 pieces of D4*50L end mills per cycle.
      3. What is the effective coating area and size of the MD200?
      The effective coating area is Ф310*400 mm, with a chamber volume of 0.5 m³. The physical dimensions of the equipment are 3400*2000*2500 mm (Length*Width*Height).
      4. What is the typical process time for AlTiN coating?
      For AlTiN coating, the standard process run time on the MD200 equipment ranges from 6 to 8 hours.
      5. What are the maximum working temperature and power requirements?
      The MD200 is designed to operate at a maximum working temperature of 500℃ and requires a power supply of 120 kW.

      sendinquiry