DLC series——DLC Coating Machine
Bilateral open-door structure, Easy to operate
Stable process technology, Automated operation
Smooth coating,Avoid large granule pollution
Clean product by plasma, Increase coating adhesion
Adopt PECVD hybrid technology, Wider application scenarios
-
Deposition temperature: <250℃
Applicable materials: Steel, titanium alloy, aluminum alloy, etc. -
Smooth surface, atomic deposition without affecting the roughness of the product. -
Low coefficient of friction
Grind against steel<0.2
Grind against Titanium alloy <0.1
Lubrication, reduction of consumption. -
Excellent wear-resistance (performance as hundreds time of steel) greatly extend the service life of parts. -
Excellent anti-corrosion performance (chemical inertia).

Structural design Characteristics of Huasheng DLC coating
The structure design of Huasheng DLC coating is based on the coating requirements for parts such as wear-resistance, lubrication, anti-corrosion and high binding strength, following the design concepts of “Multilayer structure””Gradient transition”and “Incision Integration”.

DLC coating structure design

Coating 2-4μm
| Model | DLC800PRO | |
| Coating Technology | magnetron sputtering+PECVD | |
| Coating Type | Cr/WC/a-C:H | |
| Etching | SET | |
| Cathodes (number) | 4 | |
| Equipment Size | Length4100*Width1200*Hight2500 | |
| Cavity Volume | 0.8 | |
| Effective Coating Area | Ф650*400 | |
| Coating Deposition Temperature | <200 | |
| Capacity (number of trees) | 10 | |
| Max. Loading Weigh (KG) | 500 | |
| Shaft Diameter (mm) | Ф130 | |
| Processing time (h) | 6~8 | |
| Model | DLC1500MAX | |
| Coating Technology | magnetron sputtering+PECVD | |
| Coating Type | Cr/WC/a-C:H | |
| Etching | SET | |
| Cathodes (number) | 4 | |
| Equipment Size | Length4900*Width1800*Hight2950 | |
| Cavity Volume | 2 | |
| Effective Coating Area | Ф900*1000mm | |
| Coating Deposition Temperature | <200 | |
| Capacity (number of trees) | made-to-order | |
| Max. Loading Weigh (KG) | 1000 | |
| Shaft Diameter (mm) | largest dimensionФ350 | |
| Processing time (h) | 6~8 | |


HD500