• icon_youtube
  • Linkedin
  • Leave Your Message

    China MD200 Arc Coating Equipment - Reliable Suppliers and Factory for High-Quality Ion Plating Solutions

    The MD200 is a state-of-the-art compact arc ion plating system, perfect for small-batch production, non-standard tools, and the coating of resharpened tools. This innovative system features 4 arc sources and advanced WET lateral hot filament etching technology, ensuring consistent coating quality and enabling flexible production capabilities. As a leading manufacturer in China, our factory provides practical in-house coating solutions tailored to meet the unique needs of various industries. Trust our expertise as reliable suppliers to enhance your tooling processes with the MD200

      Product Advantage

      High deposition rate

      The current density of the arc spot is as high as 1012A/m2, and the energy density is as high as 1013W/m2. The high energy density directly leads to the transformation of the target material at the arc spot from solid phase to metal vapor plasma.

      High ionization rate

      Arc discharge is generated between the cathode evaporation source and the shell, and glow discharge is generated between the workpiece base and the shell, causing the cathode target to evaporate and ionize, generally up to 60-80%.

      efficient and convenient

      Fully automatic coating system, efficient and reliable, capable of batch production 4-5 times a day, equipped with historical records, storable process recipes, offline editing, abnormal alarm, and touch screen operation.

      High impact resistance

      The film has moderate hardness, film adhesion, high rigidity, and good impact resistance, suitable for rough machining.

      Product characteristics

      • Product characteristics
        Capability for fast delivery (Get the shortes production process)
      • Product characteristics
        Customized individually
      • Product characteristics
        High stability (More than 10 years ofproduction experience)
      MD Equipment-Arc PVD Coating

      Workpiece:

      42CrMo (38-42HRC)

      GB:42CrMo

      ASME:4140

      JIS:SCM440

      Cutting data:Blind Hole Drilling

      Cutting speed Vc = 70m/min

      Feeding Fn = 0.15mm/r

      Cooling:External cooling, Emulsion

      MD Equipment-Arc PVD Coating (3)

      Result:

      Huasheng's HPD130 coated tool can achieve a cutting life of 63 meters

      The coated tool from competitor BHE offers a cuttinglife of 49 meters。

      The cutting life has been improved by 28.6%

      MD Equipment-Arc PVD Coating (1)
      MD Equipment-Arc PVD Coating (10)

      Product Parameter

      Specifications Technical Data
      Model No.
      MD200
      Coating Technology Arc ion plating
      Etching WET lateral hot filament etching
      Dimension (mm)
      L3400 × W2000 × H2500
      Chamber volume (m³) 0.5
      Effective Coating Area (mm) Φ310 × 400
      Max Working Temp. (°C)
      500
      Capacity (trees) 3
      Insert Load (APMT1135) 3600 pcs
      Round tool Load (D4×50L) 1000 pcs
      Max Load (KG)
      200
      Spindle diameter (mm) Φ130
      Process Time (h) AlTiN 6–8
      Frequently Asked Questions

      What coating technology does the MD200 model utilize?

      The MD200 uses Arc ion plating technology coupled with WET lateral hot filament etching to ensure superior coating adhesion and surface preparation quality.

      What is the load capacity of the MD200 coating system?

      The system supports a maximum load of 200 KG. It can accommodate up to 3600 pieces of APMT1135 inserts or 1000 pieces of D4×50L round tools per batch.

      What are the dimensions and effective coating area of the machine?

      The physical dimensions of the MD200 are L3400 × W2000 × H2500 mm with a chamber volume of 0.5 m³. The effective coating area is Φ310 × 400 mm.

      What is the maximum working temperature of the system?

      The MD200 coating system can operate at a maximum working temperature of 500 °C.

      How long does the AlTiN coating process take?

      The typical process time for AlTiN coating on the MD200 system ranges between 6 to 8 hours.

      sendinquiry