• icon_youtube
  • Linkedin
  • Leave Your Message

    China HD800 Hybrid PVD Coating Equipment from Suppliers & Factory for Cutting Tool Manufacturers

    Introducing the HD800, the latest hybrid PVD coating equipment from Huasheng, tailored for cutting tool manufacturers and industrial users in China seeking unparalleled coating quality and enhanced batch capacity. As a leading supplier in the industry, Huasheng integrates advanced technologies, including arc ion plating, DC magnetron sputtering, and HiPIMS, into the HD800 system. This state-of-the-art equipment delivers dense, high-adhesion coatings and superior surface finishes, making it ideal for challenging materials like stainless steel, titanium alloy, hardened steel, and high-alloy steel. Enhance your manufacturing process with the HD800 from Huasheng, a trusted factory that prioritizes innovation and quality

      Product Advantage

      High deposition rate

      The current density of the arc spot is as high as 1012A/m2, and the energy density is as high as 1013W/m2. The high energy density directly leads to the transformation of the target material at the arc spot from solid phase to metal vapor plasma.

      High ionization rate

      Arc discharge is generated between the cathode evaporation source and the shell, and glow discharge is generated between the workpiece base and the shell, causing the cathode target to evaporate and ionize, generally up to 60-80%.

      efficient and convenient

      Fully automatic coating system, efficient and reliable, capable of batch production 4-5 times a day, equipped with historical records, storable process recipes, offline editing, abnormal alarm, and touch screen operation.

      High impact resistance

      The film has moderate hardness, film adhesion, high rigidity, and good impact resistance, suitable for rough machining.

      Product characteristics

      • Product characteristics
        Capability for fast delivery (Get the shortes production process)
      • Product characteristics
        Customized individually
      • Product characteristics
        High stability (More than 10 years ofproduction experience)
      MD Equipment-Arc PVD Coating

      Workpiece:

      42CrMo (38-42HRC)

      GB:42CrMo

      ASME:4140

      JIS:SCM440

      Cutting data:Blind Hole Drilling

      Cutting speed Vc = 70m/min

      Feeding Fn = 0.15mm/r

      Cooling:External cooling, Emulsion

      MD Equipment-Arc PVD Coating (3)

      Result:

      Huasheng's HPD130 coated tool can achieve a cutting life of 63 meters

      The coated tool from competitor BHE offers a cuttinglife of 49 meters。

      The cutting life has been improved by 28.6%

      MD Equipment-Arc PVD Coating (1)
      MD Equipment-Arc PVD Coating (10)

      Product Parameter

      Process Time
      AlTiN: 6–8 h
      Max Temp
      600°C
      Chamber Volume
      1 m³
      Max Load Weight
      300 kg
      Technical Specifications
      Specification Parameter Details / Value
      Model No. HD800
      Coating Technology Brand-new hybrid composite coating technology
      Etching Lateral ion source / hot filament
      Multi-arc Sources 6
      Magnetron Cathodes 1
      Equipment Size L3750 × W2400 × H2500
      Chamber Volume 1 m³
      Effective Coating Area Φ650 × 400
      Maximum Working Temperature 600°C
      Loading Capacity 10
      Insert Load 12000 pcs
      Drill Load 3600 pcs
      Maximum Loading Weight 300 kg
      Shaft Diameter Φ130
      Process Time AlTiN: 6–8 h
      Frequently Asked Questions
      What coating technology does the HD800 model utilize?
      The HD800 utilizes a brand-new hybrid composite coating technology, supported by 6 multi-arc sources and 1 magnetron cathode for high-performance surface treatments.
      What is the maximum loading capacity of this coating equipment?
      The HD800 features a loading capacity of 10, allowing for up to 12,000 pieces of insert load or 3,600 pieces of drill load, with a maximum overall loading weight of 300 kg.
      What are the physical dimensions and chamber volume of the HD800?
      The physical size of the equipment is L3750 × W2400 × H2500 mm. It features a chamber volume of 1 m³ and an effective coating area of Φ650 × 400 mm.
      What is the maximum working temperature and typical process time?
      The system can operate at a maximum working temperature of 600°C. The standard process time for an AlTiN coating run is between 6 to 8 hours.
      What configuration is used for the etching process?
      The HD800 employs a lateral ion source and hot filament configuration for the etching stage, ensuring optimal surface preparation before the coating process begins.

      sendinquiry